Over to the new house bright and early. We were having some firewood delivered. :) The first step in keeping warm this winter. We staked it up on the back porch. We still need a lot more wood, but this should be enough to get us through October and November. We are still calling and looking around for some more wood.
Once at the house we had plenty to do. Jonathan worked on the bathroom plumbing. We now have a working sink in the bathroom. :D But we need a few pieces from the hardware store to get the tub operational.

Ella is trying out the new sink. Clean those hands, Ella.
I did a bunch of cleaning. I got the landing room empty and clean. We are going to be moving the eating area back into this room. I am hoping to start setting up the bedrooms for the kids.
Then on to the hardest work of all. We started by carrying down some more plaster to the dumpster. Jonathan took down the toilet. And we turned over the huge and heavy tub. Jonathan used the giant sledge hammer to break the tub into pieces that we were able to carry out to the dumpster.

Here is the tub after he had broken it apart. :D
Jonathan broke the rest of the tub into smaller pieces and we carried it out.

No more tub or toilet here, just small bits of broken porcelain. That was a huge job. Now we only have one more tub to get out of our house. It is up on 3rd floor... anyone care to help with that one?