Then we started work on the second floor bathroom. Today's plan was to take down the wall where the bathtub used to be and start ripping everything else up in there.
Jonathan pulled the pieces of the wall down and I carried things out to the dumpster. He got the sheetrock off of two of the walls. We still have a lot to do in that room but we have gotten a lot done.
After lunch I went into the Green Room and finished removing the nails from the floor. This is the room that Zeb is going to be using when we move in. Now all that is left to do in here is wash everything down really well and we will be able to start using this room. :) It actually looks pretty good in there. Jonathan set up the commodore on an old desk in the corner. Zeb is pretty excited about this.
This is an old desk that we found up on the 3rd floor. It is probably just temporary. But Jonathan thought they went together pretty well also. The other day, Zeb was just in the room looking at the computer. Right now we have the power shut off to this part of the house so he can't use the computer. But he is very excited to see that it has become part of his "room".
ReplyDelete