Today, Jonathan took one more day off of work. We wanted to try to get just a bit more done. We want to get this dumpster filled as soon as possible. We started by lowering all of the stuff from we knocked down yesterday.
Here is the view of the 3rd floor landing room. You can see that most of the ceiling is down. There is just a bit of lathe up near the ceiling.
This is all that is left of the mess in the landing room. Yesterday this mess covered the entire floor. It was about 4 or 5 inches deep.
We got tired of playing with the insulation. So we started to move all of the stuff from the third bedroom (Zeb's future room). There was all kinds of windows, pieces of tin that was left from doing the roof last spring, some stuff that was in the house when we bought it, and the kitchen cupboards.
We got all of the stuff out of the room. And you can see that we have the yucky carpet rolled up against the wall.

This is no longer a kitchen. :) We are down to one working kitchen (2nd floor) and one kitchen in our mind (1st floor). We have now removed 2 kitchens. Jonathan had fun with the BIG sledgehammer getting this one out. Once he had it in pieces, we tossed it out the door and listened as it crashed down three floors below.
Here is the wall after Jonathan had practiced for his role in the upcoming movie. Jonathan will be playing Jackie Chan in UPS workers Feet and Fists. It will be coming out Spring 2011. He did a few side kicks and caused the whole wall to come crashing down.
We will imagine you next to us with your crow bar. Busting down the walls. :D