We are to the point where we need to do a lot of planning. We are starting to 'finish' a couple of rooms. We are going to be doing a lot of home automation, and need to get all of that figured out. We also want to be sure about the electrical and Cat 5 cable that we are putting into the walls as well as the pex for the under floor radiant heating, and the pex for the plumbing up on third floor.
We are working on the second floor tower room. So before we finish the ceiling we need to get the pex in for the radiant floor up on third floor. We also need to get the plumbing up there for the bathroom that will be on third floor. We are also hoping to run up the electrical and cat 5 while the walls are open. None of this will be hooked up for a while. But still needs to be planned out.
So we have been doing a lot of research and planning as well as 'window' shopping.